The New Pool Build Continues!
Published by: Shaun HawkeySeptember: The summer has been spent tiling the pool and installing the sauna, steam room and jacuzzi. We’re almost ready to start filling, which has to happen very slowly to avoid “shocking” the pool. July: With the windows in & the building fully water tight, the work continues preparing the pool for tiling. Watch […]